Previcon won a multimillion auction for Highway PPP project in Brazil

Previcon   2022-07-24 19:30:40
广告

Previcon has won a BRL406 million (US$74.81 million) contract for the development of the MG-424 highway which connects Pedro Leopoldo, in the Metropolitan Region of Belo Horizonte, to Sete Lagoas, in the Central Region of the state, Brazil.

Previcon will be responsible for:

  • duplication of 12.7 km of the highway;
  • construction of 29.6 km of additional tracks;
  • construction of 10.2 km of the shoulder;
  • 19 access improvements;
  • two walkways, six roundabouts, six full clovers, 32 bus stops;
  • implementation of the User Assistance System (SAU).

The duration of the contract is about 30 years.

阅读206次
返回
顶部