CEEC Signs 400MW Wind Power Project Overseas

中国能建   2024-09-20 16:44:03

China Power Engineering Consulting Group Co., Ltd. (CPECC), a CEEC subsidiary, inked an EPC contract for the San Quintin 400MW wind power project with Power Beacon Renewable Solutions of the Philippines on September 11.

This marks the first EPC contract for a wind power project signed by CPECC in the ASEAN region.

Situated in San Quintin City, Pangasinan Province, Luzon Island, the Philippines, the project includes EPC tasks such as access roads, wind turbine foundation design and construction, wind turbine supply, transportation, and installation.

Upon completion, it will effectively establish and enhance a new power system primarily powered by new energy, address the current regional power shortages, alleviate local electricity deficits, and drive the high-quality development of the local economy.

1290次
返回
顶部