L&T awarded Significant Contracts in Saudi Arabia, UAE and Kuwait
The Power Transmission & Distribution (PT&D) vertical of Larsen & Toubro announced in a statement that it has secured significant orders across the Kingdom of Saudi Arabia, the UAE, Kuwait and India.
In Saudi Arabia, an order for a key 380kV Substation which will facilitate evacuation of solar generation has been secured.
In Dubai, PT&D has bagged orders for establishing a set of EHV substations which includes a 400/132kV Substation. Several substations are being added to the Emirate’s power transmission infrastructure as it seeks to remain a preferred destination to live, work and visit.
Then, at a major city project in Kuwait, PT&D has won a 400kV Substation order.
In India, L&T has won a project to implement an Advanced Distribution Management System in West Bengal. This technology enhances power distribution by integrating Outage Management and Distribution Management System functionalities. With real-time monitoring and control of medium and low-voltage networks, the system will improve network reliability, allowing for quick fault isolation and faster restoration.