CEECATL signed microgrid energy storage project in DRC

CEECATL   2025-04-02 17:14:36

On March 31, CEECATL successfully won and signed the Integrated Energy Microgrid Energy Storage System Supply Project (27.5MW/89.6MWh) in the Democratic Republic of the Congo (DRC).

Located in a mining area in southeastern DRC, CEECATL developed a high-safety, long-life, and intelligent grid-forming energy storage system tailored to the project’s power demand and load characteristics through in-depth technical research and feasibility studies. The solution ensures reliable power supply and emergency backup for the facility, enables off-grid operation, reduces production costs, and enhances overall project profitability.

This contract represents a breakthrough in innovating integrated energy solutions for industrial, commercial, and mining park applications, paving the way for further expansion into global markets.Moving forward, CEECATL will continue to uphold CEEC’s 1466 Development Strategy, leveraging cutting-edge technologies and efficient services to deepen its global presence and promote more "CEECATL Smart Solutions" worldwide.

阅读1610次
返回
顶部